CoBeck recently completed a 50,000 s.f. production space addition for both new and relocated medical device manufacturing equipment. The addition included a shipping/receiving area, loading dock, storage space, restroom facilities and office area for their high-tech manufacturing and production operations. In the existing facility a fire protection system was installed throughout and around manufacturing equipment, including a chemical agent system in the IT space. The existing exterior wall had to be removed and construction of a temporary, weather-tight wall around the machines and adjacent to the existing pre-cast wall was provided with clear access to existing production.